Model:DY-2
Use:automated pull-off testers
Standard:JGJ110-2008;GB50550-2010
The Proceq DY-2 family of automated
pull-off testers covers the complete range of pulloff applications with
unmatched ease of operation and a unique capability to store a complete record
of the test.
Pull-off testing is one of the most widely
used test methods in the construction industry. This is reflected in the huge
number of standards dedicated to the method. It has long been known that one of
the major influences on the result of a pull-off test is the operator influence
in the application of a constant load rate. The DY-2 with its integrated, feedback
controlled motor removes this variable completely, by providing a fully
automated test at a constant load rate which can be verified. The DY-2 is
further unique in that it records every single test parameter required by the
specification.
? Time and date of the test
? Test disc size
? Maximum load applied
? Automatic calculation of bond strength
? Applied load rate with graphical record
? Complete time of test
? Failure mode For the very first time, the
operator is able to provide a complete record of the pull-off test, proving
that the test was carried out in accordance with the applicable standard.